Baseline Concept & Methodology
Pre-project consumption as baseline; adjustment for weather, occupancy, production volume.
10 min read · Jacob Willis, Net Zero Lead · Last reviewed July 2026
Every saving is measured against a baseline - a picture of how much energy was used before the project. Getting the baseline right is the foundation of all M&V; get it wrong and every saving figure is wrong.